Saint Meinrad
home about us location & map news events contact us job postings
school of theology monastery
programs scholar shop library alumni giving
monastery abbey press caskets
Give to Saint Meinrad: Capital Campaign
What Your Gift Can Do
Ways to Give
Recognition Societies
Capital Campaign
Brick Pavers
Make a Gift Now
Request Free Info
Contact Us

Will Your Employer Double Your Gift?
Click Here to Find Out.

Campaign Projects

Several construction and renovation projects have already been realized as a result of our capital campaign. Others are under way as we move forward with our plans and still others are set to begin as funding becomes available.



St. Gregory Hall Renovation (View slideshow of dedication)

Begun in December 2006, renovations of Sherwood Hall and north/south Benet Hall addressed issues of outdated and inadequate heating and air conditioning, dilapidated windows, inadequate electrical and plumbing services, and out-of-date technology. In 2007 the two halls were renamed St. Gregory Hall by Archabbot Justin DuVall, OSB.

Renovation also included cosmetic repairs and a new layout to better suit the needs of students and faculty. Upgrades to Sherwood Hall were completed in January 2008 and Benet Hall renovations were anticipated to be completed in the following months. St. Gregory Hall was dedicated in a ceremony on February 2, 2008.

Changes include:
  • Renovation of the third and fourth floors of Benet Hall to provide 23 student rooms with private baths and modern technology.
  • Renovation of the third and fourth floors of Sherwood Hall to provide 42 rooms with private baths and modern technology, along with student lounges, computer terminals and kitchettes.
  • Renovation of second-floor Sherwood to provide faculty offices.
  • Renovation of first-floor Sherwood for administrative offices.
  • Adding new elevators, stairways, and heating and air conditioning services.
  • Renovation of adjacent courtyards.
  • Removal of the Sherwood Annex building and construction of a new gallery connecting Sherwood Hall and St. Anselm Hall.

St. Thomas Aquinas Chapel Renovation

The School of Theology chapel was renovated, expanded and air-conditioned. (Completed in 2004)

Benet Hall Renovation

The east-west wing was remodeled into 48 guest rooms, with private baths and air conditioning. (Completed in 2004)

Guest House and Retreat Center

Completed in the fall of 2005, the new facility includes a welcome area with entryway, registration and display areas, offices, and a switchboard area; a retreat center with two meeting rooms; a food service area including kitchen, dining room and private dining room; 31 guest rooms, including six rooms in a silent wing; three reading rooms; and the oblate offices. Take a virtual tour.